The two tracks to Arosa, 1 and 2, are still at the same location, but the tracks are connected to the RhB network and the traction current is now identical to the RhB basic network. Taken 11/03/2023
The two tracks to Arosa, 1 and 2, are still at the same location, but the tracks are connected to the RhB network and the traction current is now identical to the RhB basic network. Taken 11/03/2023